Goal...
Made it to the goal. All spent and still owe a lot but made it. The roof is on so the church can meet in a dry place instead of a tent. Still much to do but must wait on the Lord's timing. Need to build a retaining wall so water from the adjacent property does not flow through the building and needs doors and windows and fencing so drunks and kids do not use it as a bathroom, game room, drug hang, out ect ect. After it is secure it needs electric as well. Then the first night services... Baptisms in about 2 weeks...
0 Comments:
Post a Comment
<< Home